Skip to main content

DESIGN AND IMPLEMENTATION OF A COMPUTERISED MARKET SURVEY REPORTING SYSTEM



ATTENTION:
BEFORE YOU READ THE PROJECT WORK, PLEASE READ THE INFORMATION BELOW. THANK YOU!

TO GET THE FULL PROJECT FOR THE TOPIC BELOW PLEASE CALL:
08068231953, 08168759420

TO GET MORE PROJECT TOPICS IN YOUR DEPARTMENT, PLEASE VISIT:



DESIGN AND IMPLEMENTATION OF A COMPUTERISED MARKET SURVEY REPORTING SYSTEM
ABSTRACT
            This project is based on the possible exploration of computer Technology in Today society in market surveying in the daily discharge of duties.
            This project involves the design and development of computerized market survey report analysist.
            The design will enable the user to achieve a desirable report at an increased efficiency, accuracy and speed of doing work and at the same time reduce man – hour repured for piece of work.
            This calls for an alternative method which ie accurate, quick and inexpensive.  This project achieved merit by eliminating all these flows that result from manual operation and present a very accurate, decisive and systematic measure of survey report.
TABLE OF CONTENT
CHAPTER ONE
1.0       Introduction
1.1              Background
1.2              Aim or objective of the study
1.3              Statement of the problem or purpose
1.4              Justification of the purpose topic
1.5              Scope of the project
Methodology
Block diagram
Thesis Organization
CHAPTER TWO
LITERATURE REVIEW
CHAPTER FIVE
3.0       overview of the existing system
3.1              Description and analysis of the existing system
3.2              Method of data collection
3.2.1        Interview method
3.2.2        Reference to written text
3.3              Input analysis
3.4              Process analysis
3.5              Output analysis
3.6              Input analysis
3.7              Problem of the existing system
3.8              Justification for the new system
CHAPTER FOUR
4.0              Design for the new system
4.1       Output specification and design
4.2              Input specification and design
4.3              File design
4.4              Procedure chart
4.5              System flowchart
4.6              System requirement
CHAPTER FIVE
Implementation
Program design
Program flowchart
Pseudo code
Source listing
Test-run
CHAPTER SIX
DOCUMENTATION
CHAPTER SEVEN
Recommendation & conclusion
Reference
Appendix (if any)

CHAPTER ONE
1.0       INTRODUCTION
            In order not to embrace hitch in the carrying out of any project, it is necessary to define the objective of the project.  The process surveying enable us to map out the limitation and the delimitation of the project.
            In surveying, we set out the necessary steps and areas that considered to be useful and necessary to implement the objective.
            In this case, we identify the problem, it’s sources, causes and to identify solutions to the problem.
            In the case study of doing these, the objective must be certain.
1.1              BACKGROUND OF THE STUDY
The Background of this study involves indent study of the system report being designed to determine the input data to the report system and how system report objective can be realized.
Data collected or survey made determined the system output and input and grouped into various files (1) Equipment requirement.
EQUIPMENT REQUIREMENT:     To use this report system in survey the following equipment may be needed.
i)                    An IBM or its compatible
ii)                  Magnetic Diskette (3.25 x 5.25 or 35 x 3.5 inches)
iii)                An IBM line printer or its compatible
iv)                A printer interface cable.
Optional equipment:   Hard Disk Properly Installed.
MEMORY REQUIREMENT:           The design of this system was highly structured by breaking the program in module using Top-Down design technique and loding the program in GW BASIC.  Each program after use call another program from the diskette and pass over the content of relevant variable over to the incoming program by using “COMMON” statement it minimizes effectively the size of primary memory required by the system.
TEST DATA
            The whole system was tested by obtaining survey analysis of previous building project.  Fed the cost of sub-element into the system and compare the output.
DOCUMENTATION
            This system is documented in a way that any one who is not a computer scientist or market surveyor can use it effectively.  The following types of a documentation are implemented.
i)                    Design documentation
ii)                  Operational documentation
iii)                Test documentation
1.4              OBJECTIVE OF THE PROJECT AIM
Market survey report system has the following objectives
(i)         To give client good value for money
(ii)        To achieve the required balance of expenditure between the various parts of the building
(ii)        To keep expenditure within the amount allowed by the client.
1.5              STATEMENT OF THE PROBLEM OR PURPOSE
Recent Researchers to a great extent have been directed towards finding means of efficience, accuracy and speed of doing work and at the same time reducing man-hou. Required for each piece of work.  The success of these Researchers have been attributed to the invention of modern computers.
But all these recent invention and discoveries not withstanding, the work of the market surveyor has largely remained a manual work.  Hence the research problem is to explore the possibility of the market surveyor in Nigeria employing the technology of our days (computer) in the daily discharge of his duties.  The use of computer in cost planning has the following advantages over the manual process.
SPEED -         Computer are very fast in carrying out operations as compared to humans. E.g the production of survey plan may take five to 10 man – days.  But with computers, it is a matter of seconds.  This reduces the time of the market surveyor will spend on each job.
ACCURACY:            Once the data have been entered correctly into the computer the need for further manipulation by means of humans is eliminated and possible errors reduced.  Also when properly programmed, computers are unlikely to make computational errors.
1.4       JUSTIFICATION OF THE PROJECT TOPIC
            It is justified that ever before the introduction of computers in survey system report process, there was no accurate and complete similar work related to such.  Therefore, we advice that in the course of this research work if necessary any suggestions would be welcome.
1.5       SCOPE OF THE PROJECT                                                                                                                      












METHODOLOGY
            For a perfect and accurate result a any system, it all depend on the data collected.  In any Research of this nature, it sis proper to ambark on secondary method of data collect in other to, achiee a decisive result.
SOURCE OF DATA
            The source of data for this project work include text book, journals, market surveying firms and computer centers.
METHOD OF DATA COLLECTION
            The data collection method used in this work are personal interview and distribution of questionnaires to market surveying firm, and use of website (internet)
REASONS FOR DATA COLLECTION METHOD
            Because of the nature of the project work which does not call for the sampling of people’s opinion, But  ascertaining what is obtainable in the field, and interviewing of market surveyors was adopted.
            On the other hand, visiting of NET and professional journals like I said earlier was consulted to facilitate balancing between the idea and the actual practice.
THESIS ORGANIZATION
            This research work is based on two angles. First, it is viewed that, the survey report system needs enhancement format to facilitate the process.  Tow, the market surveyor needs to be equipped with items needed to enhance his efforts.
            Therefore, the use of computer is considered necessaries market surveying system processing.
            In this research work, the use of computers, its importance, and its application in market surveying has been stated and specified int his project work.  What the surveyor need to do, how he can do it, and how he can use it are all stated and specified here.









AFFILIATE LINKS:





Comments

Popular posts from this blog

WAZOBIA INVESTMENT WILL CRASH BY OCTOBER.

WAZOBIA INVESTMENT WILL CRASH BY OCTOBER.   History repeats itself, a lot of investments have been pouring in large proportions into the fastest growing scheme in Nigeria called wazobia investment.   However, a vast majority of these investors are still very much worried, they keep asking-when will this scheme come to an end, some even inquire from fellow investors as to a likely time.   Well, this information should not be ignored, I mean what I am about to say here Firstly, strong observations have it that ponzi scheme operators pay you initially with their money, the doubled money you received is from their pocket. They invest huge cash into the system, their aim is to draw in more persons. The people that gain more in a ponzi scheme are the early starters, so these guys keep pumping money into the system with an expectation of more persons.   WAZOBIA CRASH WILL BE GREATER THAN OR CLOSE TO THAT OF M-M-M   Reasons, before you withdraw from wazobia you have to ...

ENGLISH LANGUAGE EDUCATION PROJECT TOPICS AND MATERIALS

  ENGLISH LANGUAGE EDUCATION PROJECT TOPICS AND MATERIALS       ATTENTION: BEFORE YOU READ THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   NOTE: WE WILL SEND YOU THE ABSTRACT, TABLE OF CONTENT AND CHAPTER ONE OF YOUR APPROVED TOPIC FOR FREE. CHOOSE FROM THE LIST OF TOPICS BELOW. SEND YOUR EMAIL ADDRESS AND THE APPROVED PROJECT TOPIC TO ANY OF THESE NUMBERS-08068231953, 08168759420   WE WILL THEN SEND THE ABSTRACT, TABLE OF CONTENT AND CHAPTER ONE FOR FREE   NOTE ALSO: WE CAN ALSO DEVELOP THE FULL PROJECT WORK CALL: 08068231953, 08168759420       ENGLISH LANGUAGE EDUCATION PROJECT TOPICS AND MATERIALS     1.     STYLISTIC ANALYSIS OF CHIMAMANDA NGOZI ADICHIE’S HALF OF A YELLOW SUN 2.     PIDGIN ENGLISH ON RADIO AS A MEANS OF EFFECTIVE COMMUNICATION TO ILLITERATE AUDIENCE 3.     A CRITICAL, RATIONAL AND REFLECTIVE...

AN ASSESSMENT OF THE ROLE OF INTEREST RATE IN ENHANCING INVESTMENT IN DEVELOPING COUNTRIES: THE NIGERIAN EXPERIENCE (1981-2005)

ATTENTION: BEFORE YOU READ THE PROJECT WORK, PLEASE READ THE INFORMATION BELOW. THANK YOU! TO GET THE FULL PROJECT FOR THE TOPIC BELOW PLEASE CALL: 08068231953, 08168759420 TO GET MORE PROJECT TOPICS IN YOUR DEPARTMENT, PLEASE VISIT: www.easyprojectmaterials.com www.easyprojectsolutions.com www.worldofnolimit.com AN ASSESSMENT OF THE ROLE OF INTEREST RATE IN ENHANCING INVESTMENT IN DEVELOPING COUNTRIES: THE NIGERIAN EXPERIENCE (1981-2005) ABSTRACT         This work examines the role of interest rate in enhancing investment in Nigeria from 1980-2004. In carrying out the study we employ and econometric data analysis techniques of multiple regressions to text the relationship between interest rate, real income and investment. Our result reveals that interest rate is negatively related to investment while real GDP was positively linked to investment. The low lev...